SD – Availability Check
You control the availability check using general and SD-specific control features. The following control elements need to be maintained in Customizing and in the material master record:_ Strategy groupThe allowed planning strategies (main strategy and further possible strategies) are combined in the strategy group. As of Release 3.0, the strategy group is specified in the [...]